新葡的京集团350vip8888_3512 cc新萄京网址

Yunnan Baiyao Group Phase I Project Logistics System Project

3512 cc新萄京网址

3512 cc新萄京网址

        The equipment and system of the center are as follows:

        1) 12 sets of railroad road stacking machines;

        2) A set of box picking and conveying systems;

        3) A set of vacuum systems;

        4) A set of software control systems;

        5) A set of pallet picking and conveying systems.

Baidu
sogou